Get in Touch Now!

  • This field is for validation purposes and should be left unchanged.

Contact Us Now

  • This field is for validation purposes and should be left unchanged.
Logo1

Main Menu

  • HOME
  • CONTAINERS
  • ROTAINERS
  • CASE STUDIES
  • VIDEOS
  • CBH
  • GRAIN
    • GRAIN LOADING & STORAGES
  • BIOMASS
  • SHIPS CRANE
  • UREA LOGISTICS
  • NEWS
    • ABOUT ISG
  • CONTACT US
Logo1
We supply rotainers for mining, grain & ship loading industries
Download Brochure
Enquire Now
  • HOME
  • CONTAINERS
  • ROTAINERS
  • CASE STUDIES
  • VIDEOS
  • CBH
  • GRAIN
    • GRAIN LOADING & STORAGES
  • BIOMASS
  • SHIPS CRANE
  • UREA LOGISTICS
  • NEWS
    • ABOUT ISG
  • CONTACT US
Call us now +61 400 035 548
Case Studies
  • Home
  • Case Studies
    • Case Study 3: Australian Mineral Sands Projects
    • Case Study 1: Bolivia Urea Project
    • Chile Rail FEPASA
    • CODELCO in Chile
    • Congo Project
    • CONTAINERTIPP Copper Concentrate
    • Copper Concentrate with Heavy Duty
    • Copper Concentrate with Rear Tipping
    • Copper Concentrates in America
    • Cristal Mining
    • Fertilizer Grade Containers
    • Height Container Europe
    • Case Study 2: Mexico-copper / iron ore project
    • Oz Minerals
    • Case Study 5: Peru Copper Export
    • Queensland Nickel
    • Shed Solution
  • Container Types
    • High Cube rotainers
    • Mineral Concentrates Containers
    • Ore rotainers
    • Flexitop Containers
    • Waste and Scrap Containers
    • Rear Tipping rotainers
    • Half Height Container
    • Multipurpose – High Cycle rotainers
    • Heavy Duty – High Cycle rotainers
    • Side Tipping Containers
  • Videos
  • Containerised bulk handling
  • Grain
  • Biomass
  • Ships Crane
  • News
  • Contact Us
Download Brochure Enquire Now
Contact Details
info@pittoship.com
+61 400 035 548

Cristal Mining

1

In 2013 Cristal mining (Bemax Resources) went to tender for 1,750 bulk mining containers for mineral sands.

After a long tender process ISG was awarded the tender to deliver their bulk mining container with the patented lid design.

The containers are being delivered into Flinders ports one month ahead of schedule and the first ship load is estimated to be loaded in early September 2013.

Related Case Studies

Case Study 23: Loading Sugar

Learn More

Case Study 24: Canada Copper Loading

Learn More

Case Study 25: Copper Loading in Chile

Learn More

Call our local representative in your country, please look for your local no. on our contact page.

Contact Us Now
Logo
Call us now +61400035548

Intermodal Solutions Group Pit to Ship solutions™

  • High Cube rotainers
  • Mineral Concentrates Containers
  • Ore rotainers
  • Flexitop Containers
  • Waste and Scrap Containers
  • Rear Tipping rotainers
  • Half Height Container
  • Multipurpose – High Cycle rotainers
  • Heavy Duty – High Cycle rotainers
  • Side Tipping Containers

Solutions

  • Containerised bulk handling
  • Grain
  • Biomass
  • Ships Crane
  • What are rotainers

Helpful Link

  • Case Studies
  • Container Types
  • Videos
  • News
  • Contact Us
© 2022 Intermodal Solutions Group. All Rights Reserved
Powered by Click Click Media